Welcome to Rocky Mountain Solo FORUMS Event Details January 24 – Winter Series #3 (PPIR)

Welcome to Rocky Mountain Solo FORUMS Event Details January 24 – Winter Series #3 (PPIR)

Viewing 13 posts - 1 through 1 (of 1 total)
  • Author
    Posts
  • Ann CriquiAnn Criqui
    Keymaster
    Post count: 118

    Please include Safety Steward (SSS) assignments in this thread, along with Course Maps, SpeedWaiver link, Run/Work Order, Specialty Jobs, T&S Trailer Jobs, Tech Workers, and Grid Sheets.

    Winter Series #3 Link on MSR

    Chelsea TattershallChelsea Tattershall
    Moderator
    Post count: 227

    Specialty Jobs:

     

    Setup:

    1) Gerard Brandimarte

    2) Ryan Sotak

    3) Salil

    4) Joe Brennan

    5) Megan

    6) Paul

    Tear Down:

    1) Calvin

    2)

    3)

    4)

    5)

    Calvin StaubCalvin Staub
    Participant
    Post count: 20

    In for teardown

    Calvin Staub 191 CAM C

    John VictoriaJohn Victoria
    Moderator
    Post count: 97

    Glen

    SSS for Jan 24

    Jeffrey Hugo, Jeff Humphrey, Randy Hickman, John Victoria

    Salil ShuklaSalil Shukla
    Participant
    Post count: 7

    Set up please.

    Salil Shukla

    1 SS

    Joe BrennanJoe Brennan
    Participant
    Post count: 28

    Setup please.

    Joe Brennan 23 SSM

    John VictoriaJohn Victoria
    Moderator
    Post count: 97

    Glen

    SSS for Jan 31

    Jeff Humphrey, Tom Johnston, Jeff Hugo, John Victoria

    Glen OutcaltGlen Outcalt
    Moderator
    Post count: 104

    Trailer Work Assignments for Winter Series #3 1/31/2021

    Heat 1
    Radio: James Darden
    Log: Jeanette Wicks
    Computer: Keith Papulski
    Supervisor: Glen Outcalt

    Heat 2
    Radio: Jaime Khublal
    Log: Hsun Chen
    Computer: Terry Brown
    Supervisor: Jon Kuo

    Glen OutcaltGlen Outcalt
    Moderator
    Post count: 104

    SSS Assignments for Winter Series #3 1/31/2021

    Heat 1
    Jeff Hugo
    John Victoria

    Heat 2
    Tom Johnston
    Jeff Humphrey

    Glen OutcaltGlen Outcalt
    Moderator
    Post count: 104

    Run Work order for Winter Series #3 1/31/2021

    Run 1 / Work 2
    SS DS HS SSC HCS STH STU X CAMC XSA XSB

    Run 2 / Work 1
    AS BS CS ES FS GS STS STX STR S PM CAMT CAMS

    Robert StanleyRobert Stanley
    Moderator
    Post count: 134

    Site Map and Grid Map for WS 3

    Attachments:
    You must be logged in to view attached files.
    Robert StanleyRobert Stanley
    Moderator
    Post count: 134

    Heat 1 Grid Sheet

    Attachments:
    You must be logged in to view attached files.
    Robert StanleyRobert Stanley
    Moderator
    Post count: 134

    Heat 2 Grid Sheet

    Attachments:
    You must be logged in to view attached files.
Viewing 13 posts - 1 through 1 (of 1 total)
  • You must be logged in to reply to this topic.